Delayed by DIAC: Australian skilled visa processing times explained

by Lauren 16/09/2008 17:54:00

In the Australian Visa Bureau Casework Department, we take responsibility for seeing our clients through the Australian visa application process. Essentially, this means that every year we help a large number of applicants and their families through to getting their Australian visas approved.

We try to ensure that our clients are as informed and prepared as possible throughout their application, but due to the nature of the migration process, there are some aspects which are beyond our control. For example, once we have lodged a visa application to the Australian Department of Immigration and Citizenship (DIAC), the case is essentially out of our hands until the visa has been granted. Unfortunately, in the last year or so, DIAC's processing times have become almost impossible to predict.

So why are there such variations between DIAC processing times? What prevents them from providing a concrete, consistent timeline? As with any large, bureaucratic organisation like DIAC, there are a number of reasons, many of which stem from last year's re-vamp of the General Skilled Migration (GSM) programme on September 1, 2007.

In the run-up to the GSM changes, there were a huge number of visa applications lodged by applicants keen to apply under the old migration programme, with DIAC reporting that August 2007 saw five times as many applications as usual. With so many applications lodged before the new changes came into effect, DIAC were already struggling to keep to their normal schedules by the time they changed to the new GSM system, which brought with it a number of changes to the processing methodology used by the department.

One of these was the introduction of widespread online processing. Before the GSM programme was over-hauled, the only visa that could be processed online was the now-defunct Skilled Independent Regional (SIR). However, following September 1, all GSM class visas can now be lodged through online processing.

While this might not seem like a cause for further delays, the new online processing brought with it a number of teething problems. While many of these initial difficulties have since been resolved, there is still no indication that online processing is any more efficient. For example, we have had applications lodged in April 2008 through manual processing that have already been granted, whereas applications lodged in January 2008 through online processing are still languishing in visa limbo.

Additionally, July 2008 also saw the opening of a new processing centre in Brisbane, to accompany the processing centre in Adelaide. Again, while we hope that it'll result in shorter processing times in the long term, we're still caught in the transition period and are yet to see any acceleration of processing times.

So, despite the attempts made to provide a faster, more efficient process for General Skilled Migration applications, the end result is that we've seen DIAC processing times balloon to be as much as three times as long as they were a year and a half ago. We currently give the average processing time for an Australian skilled visa as approximately 9 months, but this is only a rough estimate; depending on DIAC, it could be either longer or shorter.

While I'd be delighted if DIAC's process were formalised to the point that we could give our clients exact visa grant dates, that doesn't seem like it'll become a tangible reality in the short term. However, what I can do is ensure that clients are kept aware of the situation and know to use the time constructively so that whenever their visa is granted, they'll be ready.

- Lauren Mennie is the Casework Department Manager of the Australian Visa Bureau

Visa Bureau takes no responsibility and cannot be held accountable for action taken as a result of any information or comment provided on this blog, and we recommend that you always seek a number of opinions before making a decision regarding your migration or visa application. Please refer to the Visa Bureau terms of use for more information.

Related posts

Comments

17/09/2008 08:45:18

Hi...
This is sachin Malik From pitam Pura, Delhi, India.
i was appliying for Visa under SIR 475offshore Visa on 2nd may,08...It was told me that it only took max. 6 months but unfortunately stil they(DIAC)processing
Last year cases....i regularly check my E_visa but result same....I m
not sure still when my case will aloted case officer.

sachin Malik

17/09/2008 17:50:59

Hi Sachin,

Sorry to hear that you're still waiting on DIAC - unfortunately, your situation seems to be a prime example of the problems we've been facing. Even though we've seen subclass 475 visa applications receive priority processing in the past, this seems to be less common now. Like other visas, its now become almost impossible to predict how long DIAC will take to get back to applicants.

Good luck in your application though, and hopefully you won't have to be waiting too much longer!

Tom

Tom

Visa Bureau takes no responsibility and cannot be held accountable for action taken as a result of any information or comment provided on this blog, and we recommend that you always seek a number of opinions before making a decision regarding your migration or visa application. Please refer to the Visa Bureau terms of use for more information.

22/09/2008 08:34:35

hi sohrab here

its realy getting serious i had apllied for PR skilled inde.subclass BN 136 on may 2007 but there is no case officer allocated yet.i had mailed them for mercy on people whose life is in thier hands so dont hang them on time line just give them the real time will be taken no matter its two years or more yes it is because we cannot plan any thing about long term job,getting own house,getting babby who are married,investing long term sooooooo on.

so pl if you can forward this message to them at least show the real time on auto email reply system of aspc and mail to aplicant about thier time line.

sohrab pathan

22/09/2008 18:35:31

Hi Sohrab,

Unfortunately, its a situation we're all currently stuck in. However, if you have been waiting longer than DIAC initially stated to you, then we recommend you go to http://www.immi.gov.au/contacts/forms/gsm/post.htm to lodge a direct enquiry online. Otherwise, we'll have to keep hoping for the best.

Kind regards,

Tom

Tom

Visa Bureau takes no responsibility and cannot be held accountable for action taken as a result of any information or comment provided on this blog, and we recommend that you always seek a number of opinions before making a decision regarding your migration or visa application. Please refer to the Visa Bureau terms of use for more information.

16/10/2008 10:14:08

Dear Tom,
I've already lodge my aplication since 21 January 2008, I've get file200le number om June'09 2008. I hope you can help me to get aproximation about my Visa granted. I with my family very exciting to live and become Australia PR. My Doughters said that she want to be the best citizen in Australia, and I fell hapy to hear that. Finaly please give me the answer about when we can fly to your country, that should to be my country.
Thanks for ur attention.
Regards,
Basmah

Basmah

16/10/2008 10:23:30

Dear Tom,
to aplied my Skill Independence visa sponsored, by my agents. and they can not give me the answer about when will we can get the granted visa.We hope u can answer my quetion. thanks a lot Tom.

regards,
Basmah

Basmah

17/10/2008 13:04:49

hi tom sohrab pathan again i have mailed to immigration minister of australia and requested him to focus on serios situation
of visa processing and people facing like pause in thier life for these apllication.

sohrab pathan

17/10/2008 14:31:39

hello
this is nazib,
i have applied in diac for gsm 175 category. i have also got modl in oracle.
i have applied in 15th october in e-lodge system..the diac site inform me that it will take 6 months to process
but i'm afraid that the process does not take 6 months it'll longer time.......

nazib

Nazib

04/11/2008 04:34:23

I have apllied to subclass 475 visa on April 2008. I got file number and lodge date was appeared
as 14 April 2008. Now I have wait for nearly seven months. Still no any feed back.
Department update do not give an idea about visa processing dates because it does not change for
more than 4 months.
We are realy fedup now, how long that we have to wait?We cant plan anything in our life. Our employements,
child education, new baby born everything getting stuck.
Why is that immigration minister or anyone do not taking any actions regarding this dealy.

Milanthi

06/11/2008 12:34:53

Hi guys,

Please could somebody let me know how long is the wait to get the skills assesment done?Cause from what i have read it seems like its going to take ages to get a subclass 475 visa .so i might as well start now.
thanks

raju

11/11/2008 08:44:03

Hi,
I had applied for Visa 176 on 2/05/2008,its been 6 months and no news yet.However I made the application from Sydney(currently on a Student Visa)where I went for my Medicals and officially sent all the documents from.Does it make any difference even though its an offshore application for it to be processed any quicker.
On an average,since my current visa expires in September 2009,will DIAC purposely grant me the PR later?
Thanks

Nerene

11/11/2008 08:49:02

Hi
I had applied for the Visa 176 on 2/5/2008.Although it is an offshore application,I had done the medicals,PCC and documents sent from Sydney.Does that make a difference,for my application to be processed any quicker?
Since Im currently on a Student Visa which expires on 30/09/2009,will DIAC purposely grant my visa at the last moment?

Nerene

11/11/2008 12:23:31

all the best guys ..anyways i am applying in about 3 mnts time and i hope by then things would be clear and they would start issuing visa on time.

raju

15/11/2008 10:33:41

Hallo please help
I have applied in skilled independent migration visa class175 as Electronic equipment trades person
Application launged on May 2008. My agent told me that within 3 months receives File no: But still
6 months over i havn't got file no:
Kindly help me as my total plannings are getting out of order.
when asked to DIAC online enquiry they told no law to reply to me,as they reply only through agent
Please say how long i has to wait for file no: also for Visa
Hari.

harikumar

18/11/2008 11:56:35

Hey Dear,

I have gone to enough forum and comments and people, have no other thing or work to do except to wait for the visa, Chill guys, You all must be working , thier must be some issues, so concentrate on your work, except for just waiting daily for Visa. I have also applied for the same, but cool .

When the time comes they will notify you.


San

Sanjeev

Comments are closed